Skip to content

Clean Business Proposal Template

Specifications

Slides
10 slides
Aspect ratio
16:9 (Widescreen)
File format
PowerPoint (.pptx)
Font
Calibri
Version
1.0
Editing
Fully editable
Primary color
#2563EB

About this template

Ten slides for a 20-minute meeting

Ten slides for a first proposal meeting, especially one with under 20 minutes of speaking time. The persuasion order is already built in: define the problem, define the scope, show the evidence, name the next step. If requirements are already locked and the client is reviewing a detailed quote, this is too short – use a document-style proposal and keep this as the opening summary.

Five agenda lines, two body slides

The agenda on slide 2 lists problem definition, scope of work, current versus proposed approach, key metrics and trend analysis, numbered 01 / 05 through 05 / 05. Only the first two items get a divider plus a body slide; the other three are single slides – the comparison on slide 7, the metric tiles on slide 8 and the bars on slide 9. Every line on the agenda has a screen behind it, so the numbering needs no repair. If you must cover a deliverables list or a detailed quote, duplicate slides 5 and 6 (divider plus body) and extend the counters to 06 / 06. In a 20-minute slot the better move is the opposite: spend the time on the two body slides and walk the last three at speed.

Sentences for those two slides

Each body slide holds three numbered lines. The problem slide takes only facts the client has already accepted; the scope slide takes only the boundary you are accountable for.

  • “Summary of six stakeholder interviews” becomes, for example, six interviews across logistics, support and IT, all naming inventory count mismatches as the problem.
  • “Success criteria agreed up front” becomes, for example, success is a stock-count variance under 2% at six months, agreed in writing.
  • “Data and environment the client provides” becomes, for example, a read-only ERP account and 12 months of order data, delivered two weeks before kickoff.
  • “Change procedure for scope” becomes, for example, written change requests answered with effort and price within five business days.

The four tiles and the phase bars

The metrics slide ships with a 16-week schedule, seven deliverable types, a KRW 140m price, and four people. Those four values are interlocked, so changing one creates an immediate contradiction: cut the schedule to 12 weeks and you will be asked on the spot whether four people can still produce seven deliverables and why the price did not move. The trend chart shows requirements 22, design 34, build 58, testing 16 – not a time series but an effort split by phase. It totals 130, so if that is person-days, check it against four people for 16 weeks, then replace the “unit: index” note with the real unit.

Where proposals break

  • Opening with a long company introduction. The first agenda item is the client’s problem for a reason.
  • Leaving the 16-week figure in place before the scope is fixed.
  • Leaving the left column of slide 7 as shipped (deliverables scattered across teams, rework at every review stage, delays discovered only after the deadline). It fits any client, so nobody reads it as their own story. Use the words you heard in the discovery interview.
  • Ending the closing slide with thanks. Under the line about delivering exactly the scope quoted, put the next meeting date or the documents you need.
Advertisement