Attendance Sheet
Specifications
- Sheets
- 3 sheets
- File format
- Excel (.xlsx)
- Font
- Calibri
- Version
- 1.0
- Editing
- Fully editable
- Primary color
-
#0F766E
Style
Tags
The previews are printed pages. The file has 3 sheets.
About this template
When to use it
One person’s attendance for one month, totalled by week and by month. Three sheets — Work log, Weekly & monthly summary, How to fill in — and the first is titled “Attendance Sheet — June 2026”. Enter clock in, clock out and break, and work hours and overtime calculate themselves: this is a time sheet, not a calendar board.
Filling order
- Rows 6–35 are 1–30 June. Change the date in column C and column D fills itself with =IF(C6=””,””,CHOOSE(WEEKDAY(C6,2),”Mon”,”Tue”,”Wed”,”Thu”,”Fri”,”Sat”,”Sun”)). Never type over column D.
- Column E takes one of six exact strings — Regular work, Annual leave, Half-day leave, Remote work, Business trip, Holiday work — because the summary sheet counts those strings. Days off are marked Day off in the sample and stay out of the counts.
- Enter clock in (F), clock out (G) and break in hours (H; 0.5 for 30 minutes). Columns I and J are formulas — leave them alone.
- Late minutes go in column K, the reason in column L.
- On the summary sheet only two cells are yours: the 168-hour monthly standard (C15) and the 21 standard workdays (C21).
How the formulas calculate
- Work hours =IF(OR(F6=””,G6=””),””,ROUND((G6-F6)*24-N(H6),1)) — clock out minus clock in, less the break.
- Overtime =IF(I6=””,””,ROUND(MAX(0,I6-8),1)) — anything past eight hours a day.
- Row 36 totals with =SUM(I6:I35), =SUM(J6:J35) and =COUNT(I6:I35)&” days worked” — the last prints the day count followed by the words days worked.
- Weekly rows use =SUM(‘Work log’!I6:I12) and flag the limit with =IF(E7>12,”Over limit”,”Within limit”) against a 12-hour weekly overtime cap, so the cell reads Over limit or Within limit.
- The category counts are =COUNTIF(‘Work log’!$E$6:$E$35,”Regular work”) — the wording is baked into the formula, so rename a label and you must edit both B26:B31 and the criteria.
Know this first
Rule 1 on the How to fill in sheet says “work hours (column H) and overtime (column I)”, but work hours are actually in column I and overtime in column J; H is the break. Typing into H because of that note corrupts the break value. Also, the “Monthly trend (reference)” table (22, 21, 20, 22 for Mar to Jun) is hand-typed reference data, not a formula, and will not move when you fill this month.
Examples
- 3 June · Regular work · 09:12 · 18:00 · break 1 → 7.8 hours, no overtime, 12 minutes late.
- 10 June · Regular work · 09:00 · 21:00 · break 1 → 11.0 hours, 3.0 overtime.
- 4 June · Annual leave — leave clock in and clock out blank; the work-hours cell stays empty and the leave count rises by one.
Common mistakes
- Writing two spellings of the same category so COUNTIF misses it.
- Typing a date as text, which breaks the weekday formula.
- Writing “1 hour” in the break column instead of the number 1.
- Reusing the file for a 31-day month without extending row 36 and the weekly ranges.