Skip to content

Market Entry Strategy Deck

Specifications

Slides
10 slides
Aspect ratio
16:9 (Widescreen)
File format
PowerPoint (.pptx)
Font
Calibri
Version
1.0
Editing
Fully editable
Primary color
#6D28D9

About this template

Not how big the market is, but how you get in

Ten slides that narrow a shortlist of markets and choose a mode of entry. Market sizing material has a different job — total and serviceable market, and the basis for both. Here the size is treated as settled, and the deck decides which country, which city, by what method, starting when, and at what point you walk away. It works just as well for entering a new industry or a new channel as for going abroad.

Contents and the slides behind them

The agenda reads “Choosing the target market”, “Timeline and exit criteria”, “Direct entry versus distributor deal”, “Key metrics” and “Trend analysis”. The first two are sections with a divider and body slide; the economics of the two entry modes are handled by the side-by-side comparison rather than by a body slide. To stand up regulation and localization, or the initial beachhead, duplicate slide 4 together with its divider. Give regulation its own slide rather than dropping it — most entry plans slip because of registration and licensing timelines rather than demand.

Narrow the shortlist with a scorecard

Slide 4 reads “4 candidate countries scored on 5 criteria”, “Vietnam ranks first at 3.9” and “Indonesia deferred to phase 2”. The scorecard itself is not in this file, so attach it as an annex and leave only the number of criteria, the leader and its score, and the deferred candidate in the body. Keep the criteria to five or fewer — market size, regulatory difficulty, competitive density, payment infrastructure, partner availability — or the scores blur together.

Set the line you retreat to, first

Slide 6 is what separates this deck from an ordinary expansion plan: “Phase 1: 6-month pilot at 40 sites”, “Phase 2: distributors in 3 provinces” and “Exit if under 100 customers by month 18” put the phase, the condition for expanding, and the exit line on one slide. Write a schedule with no conditions attached and expansion proceeds on momentum even when the pilot goes badly. Set the condition on customer count or repeat rate rather than on revenue: first-year revenue in a new market swings on a single contract and cannot carry a decision.

The comparison slide carries the mode decision

Slide 7 sets “Own local entity” against “Local distributor deal” and pairs three lines: “Paid-in capital of KRW 1.2bn needed” against “KRW 140m upfront”, “26 months to breakeven” against “Breakeven possible within 9 months”, and “Direct control of price and brand” against “Gives up 34% margin and customer contact”. The pairing is money, time, and what you give up. With three modes to compare, splitting this into two slides reads better than stretching it into three columns. Nail down which one you chose in a line immediately after this slide.

Cards and the plan line

The cards are 3.9 / “Top country score (of 5)”, 84 / “Year 1 customer target”, 26 / “Direct-entry breakeven (months)” and 4 / “Local starting headcount”. Slide 9 runs “6 months” 38, “12 months” 84, “18 months” 132 and “24 months” 186 — paying customers building up. That line is a plan, not a result, so mark it as such next to the axis title. The exit line from slide 6 is a point on this same line, so moving the target moves the exit criterion with it.

In the first year abroad there are no results, which leaves the plan line as the only evidence you have. Leave one footnote saying how it was drawn — from a qualified pipeline, or from a share assumption — so the reader can judge it rather than take it.

Before approval

  • Is the scorecard, with criteria and scores, attached as an annex? Body figures without it invite a long round of questions.
  • Does the schedule include registration and licensing time? Business registration or payment approval can push the first revenue date back whole.
  • Did you say what the four local staff will do? A plan with only a headcount stalls at hiring approval.
  • Does the closing line, “Win one city first”, match the actual plan? If you are going national from day one, rewrite it.